Incoming QC: The First Line of Defense
Every silver piece that hits our gate undergoes a meticulous incoming quality control check. Our inspectors verify the 925 hallmark, surface finish, and dimensional accuracy before any processing starts. This step eliminates over‑50% of defects that could have slipped through if we skipped the gate. By catching issues early, we reduce scrap and protect the integrity of every order.
We record every reading with a digital log and compare it to batch specifications. If a part shows a deviation, it’s either re‑worked in the shop or routed to the rework line. This practice keeps our yield high and gives buyers confidence that the stock they receive matches the specification on paper.
In‑Process Checks: Maintaining Consistency on the Line
While the silver is set, polished or cured, we run real‑time quality checks on each station. A laser measurement device confirms the thickness of the metal and the symmetry of the setting, preventing misalignment before the piece leaves the workshop. This continuous monitoring keeps the production flow smooth and eliminates costly re‑work at the end of the line.
Our in‑process team follows a strict AQL (Acceptable Quality Level) schedule: each batch is sampled at 4% of the production volume. If the defect rate exceeds 0.65%, the batch stops and corrective actions are implemented immediately. This method keeps our defect rate under 1% overall.
Pre‑Ship AQL: The Final Quality Check
| Metric | Target | Accepted Threshold | Action on Failure |
|---|---|---|---|
| Surface scratches | 0 | ≤1 per 100 pcs | Re‑polish batch |
| Hallmark legibility | Clear 925 | Any smudge | Re‑mark or discard |
| Weight deviation | ±0.5g | >0.5g | Rebalance or reject |
The pre‑ship AQL is the final checkpoint before we label the shipment as “ready for delivery.” It ensures that every piece meets the exacting standards our buyers expect. The table above shows the stringent criteria we apply, and we only release batches that pass all the metrics.
For buyers who need certifications, we can supply GRA or IGI certificates on demand. These documents confirm the purity of the silver and the authenticity of the setting, which is especially important for high‑value or custom orders.
Reject Rates: What They Mean for Your Business
Reject rates are a key performance indicator for any jewelry manufacturer. At Holycome, our three‑stage QC keeps rejection below 2%, a figure that ranks in the top 10% of the industry. Lower rejection rates translate directly into reduced lead times and lower costs for you as the buyer.
When a piece does get rejected, we immediately flag the root cause in our digital system and provide a detailed report. This transparency allows you to take informed decisions about your inventory or adjust design parameters to avoid future rejections.
Custom Orders vs. Stock: Tailoring Quality Assurance
- MOQ of 1 piece for stock – ideal for small test orders or sampling.
- MOQ of 30 pieces for custom orders – gives us scale to optimize setting lines.
- Lead time of 12‑18 days, depending on complexity.
- Production speed 20% higher than typical trading companies.
- PayPal accepted for samples; T/T requires 30% deposit.
Custom orders trigger additional design reviews and material testing to ensure the final product meets your specifications. During this phase, we involve your technical team to confirm dimensions, finish, and any branding requirements.
Our DDP delivery is 5‑8 days to the US, guaranteeing that the finished pieces arrive cleared for customs with no hidden delays. We keep buyers updated via WhatsApp +86 133 7744 7107 or email service@holycome.com throughout the process.
Cost Transparency and Pricing Strategy
Pricing for our 925 sterling silver products follows a tiered structure. The base price covers raw metal, setting, and polishing. Custom work adds a premium for design time, tooling, and extra QC. We provide a clear cost breakdown in the quotation, so you know exactly what drives the price.
Because we own the setting and polishing lines, we eliminate many middle‑man costs. This efficiency allows us to offer prices that are competitive without sacrificing quality or delivery time.
Frequently Asked Questions
What is the minimum order quantity for custom pieces?
The MOQ for custom orders is 30 pieces, with a 12‑18 day lead time. For single items, you can place a stock order with no MOQ.
How long does it take to receive a quote?
Once you submit a request, we can provide a written quote within 24 hours, including pricing and lead time details.
Do you provide quality certificates?
Yes, GRA or IGI certificates are available upon request, and can be included in the shipment at no additional cost for orders over 50 pieces.