Why your first landed cost almost never matches the quote
New buyers send me a price list, pick a ring, and ask what it lands at. The unit price on that list is maybe 60 to 70 percent of what actually hits your bank account. The rest is silver weight, setting labor, certificates, the box, freight, and duty.
I have watched first orders go sideways for twelve years, and it is almost never the stone price that kills the margin. It is the line items nobody asked about. So here is the math, laid out the way I run it on the floor.
The five cost blocks in a moissanite or lab diamond piece
Every piece we ship breaks into five blocks. Learn them once and you can price any quote from any supplier in about ten minutes.
Block 1: the stone
Moissanite is priced per carat by size and cut grade. Small melee under 2mm is cheap per carat but you need many stones, so labor to sort and set them climbs. A 1ct round brilliant is the volume workhorse. Lab grown diamonds cost more per carat and the spread between grades is wider, so grade discipline matters more.
Block 2: the metal
925 silver is quoted by weight, and weight is quoted by the piece, not by your hope. A solitaire band in size 7 might run 2.8g to 3.4g depending on shank thickness. Multiply grams by the day's silver price plus a fabrication premium.
Block 3: setting and finishing
Prong setting a center stone is fast. Pave and channel work is where labor time doubles. This is also where a trading company hides markup, because they quote the stone low and bury the setting labor.
Block 4: certificates and packaging
GRA cards for moissanite, IGI for lab grown diamonds above your chosen threshold. Pouches, boxes, and poly bags are small but real, usually under a dollar per unit at volume.
Block 5: freight, duty, and the last mile
This is the block buyers forget. Air freight on a 20kg shipment, plus your country's duty rate on jewelry, plus the customs broker fee, plus DDP handling if you want the door-to-door number.
A worked example: 100 pieces, 1ct moissanite solitaire, 925 silver
Numbers below are illustrative, so swap in today's metal and freight rates before you sign anything. The structure is what matters.
| Line item | Basis | Example figure | Notes |
|---|---|---|---|
| Center stone | per carat, 1ct round | USD 28 to 42 | Cut grade drives the range |
| Silver body | per gram, 3.1g average | USD 4.60 to 6.20 | Metal price plus fabrication |
| Setting and polish | per piece | USD 3.50 to 6.00 | Prong vs pave changes this |
| Certificate and pack | per unit | USD 0.70 to 1.40 | GRA card, pouch, box |
| Freight and duty | per shipment, allocated | USD 1.80 to 3.00 per piece | Depends on weight and route |
Add those blocks and a 100-piece first order lands somewhere in the USD 39 to 59 per piece range before your margin. If a quote comes in at USD 30 landed for the same spec, ask what got dropped. Usually it is the certificate, the silver weight, or the duty.
Where our cost and speed actually come from
We run about 20 percent better than a typical trading company on cost, speed, and yield, and it is not a slogan. It is because we cut and set in the same building the stones are graded in.
- No middle layer taking a margin between the cutter and the setter
- Incoming stone check happens before the bench starts, so bad stones never become bad rings
- Cutting yield is tracked per rough parcel, so scrap cost does not get padded into your unit price
- Production runs 12 to 18 days because scheduling is internal, not queued behind another factory
- Three-stage QC catches defects at the bench, not at your receiving dock
That last point is the one buyers underestimate. A defect found pre-ship costs us a rework. The same defect found at your warehouse costs you a customer and a return label.
MOQ, payment, and what a first order should look like
For stock designs, our MOQ is 1 piece. That is deliberate. First orders should be small and diagnostic, not brave. For custom designs, MOQ is 30 pieces per style, because tooling and CAD time has to amortize across something.
Payment is T/T with 30 percent deposit and balance against the pre-shipment inspection report. If you want a sample before committing, PayPal works for sample orders. DDP delivery runs 5 to 8 days once the shipment clears production.
Ask every supplier for the landed figure in writing, inclusive of duty, before you compare unit prices. A quote that stops at the factory gate is not a quote, it is a starting bid.
The QC steps that protect your landed cost
Three checks, in order, every order.
- Incoming stone check: carat weight, color, cut symmetry, and certificate match before the stone touches a bench
- In-process check: setting security, prong height, solder joints, and surface finish at the polishing stage
- Pre-ship AQL: sampling per AQL standard on dimension, stone security, plating thickness, and packaging accuracy
Certificates follow the stone. Moissanite ships with GRA cards. Lab grown diamonds above your grading threshold ship with IGI certificates, and the certificate number is matched to the stone before packing.
Three mistakes that inflate a first landed cost
First, ordering heavy silver. Buyers chase a low unit price and accept a 5g shank, then pay metal cost on every unit forever. Second, skipping the certificate to save a dollar, then losing the sale when a retail customer asks for paperwork. Third, shipping by express on a 200-piece order instead of consolidating, which can add several hundred dollars that never appear on the unit price sheet.
Fix all three and your landed cost drops without touching the stone price at all.
Frequently Asked Questions
What is the minimum order for a first lab grown gemstones wholesale purchase?
Stock designs start at 1 piece, so you can test quality before scaling. Custom styles require 30 pieces per design because of tooling and CAD setup. Lead time runs 12 to 18 days in production.
How is your price calculated, per piece or per carat?
Stones are quoted per carat by size and grade, and finished pieces are quoted per unit with metal weight and labor broken out. Ask for the breakdown so you can verify the landed figure yourself.
What payment terms and shipping do you offer on a first order?
T/T with 30 percent deposit and balance before shipment, or PayPal for samples. DDP delivery takes 5 to 8 days after production clears, with duty included in the door price.
Get a landed cost sheet before you commit
Send us your target design, stone size, metal, and quantity, and we will return a line-by-line landed cost sheet with duty and freight included, plus sample availability. Reach the floor team at service@holycome.com or WhatsApp +86 133 7744 7107 and we will quote within one business day.